NEWS AND ACTIVITIES OF THE COMPANY

Dates: 24 to 26 may 2011
Location:





International
trade show for the environmental sector to be take place in
Here you can visit the exhibition dedicated to innovations and developments of new products into the sectors of water, wastewater, solid waste and recycling.
For more information: www.ifat.de




This is one of the most important trade fairs in the United Kingdom dedicated to sustainable development-based projects and solutions.
It consists of a series of conferences which describe the current situation in the industry and present new ideas and solutions.
You’ll find TORRE products at our distributor’s stand, SARCO STOPPER.
Dates: 04/20/10 – 04/22/10
Location: Birmingham National Exhibition Centre

On March 22nd, 1992, the United Nations created World Water Day.
This year the theme is “Clean water for a healthy world”.
Water is the basis of life on Earth and, for this reason, it must be clean and within everyone’s reach. Poor water quality harms the environment and people’s well-being.

Our new CEDEC PE under pressure saddles include an exclusive system to attach under pressure PE branches on polyethylene pipes (up to a maximum of 16 bar).
CEDEC under pressure saddles can be plugged in directly, an exclusive system allowing you to join the PE branch pipe directly to the saddle. It is held in place by a floating clamp which offers maximum hold and requires minimal installation.
Consult the different sizes available in the product file.

SUPRAFLOW electrofusion under pressure tees are indispensable when installing large-volume by-pass diversions, whether branching, networks or standard by-pass assemblies.
Pipe perforation is made by means of a zero chip cutter, housed inside the tee and retaining the disc and all the chips produced.
The ability to install Ø90 and Ø110 electrofusion derivations so reliably and easily makes the SUPRAFLOW tees a true novelty world-wide.

Grupo Torre will be present at IWEX show (Birmingham 20 to 22/4/10) at his exclusive distributor Sarco Stopper stand.
Do not forget to visit us to see our new products!

We’ve launched a new product onto the market, the new GIGA PE saddle.
This new electrofusion, under-pressure collar is installed on polyethylene pipes registering a nominal pressure of up to 16 bar for water or 10 bar for gas.
Our R&D Department has developed this product in different sizes to be able to adapt to your needs and so that it can be used with any type of standard electrofusion accessory.
For further information, visit: www.torre.biz

Grupo Torre, with more than 130 years’ history, has moved to new facilities located in Badalona (Av. Maresme, 122).
The new headquarters spans 2,000 m² and is divided into two areas:
- Administration
- Production
Our offices are located in the administrative area where clients will receive personalised attention during our working hours: 9 am to 2 pm and 3 pm to 6 pm on Monday to Thursday and 9 am to 2 pm on Friday.
This area also includes a classroom dedicated to broadening the knowledge of our clients and their staff.
The larger production area is divided into various sub-areas, including production, quality control, storage, shipment and purchasing.
Our future plans are for the company to carry on with its activities while increasing its production and services in every corner of the planet.